Project Note · 2026-11-20

SMA Inverter & Storage Procurement: A Facilities Buyer's 7-Step Checklist

A facilities administrator's practical checklist for evaluating solar inverter and battery storage vendors—covering fuse sizing, shipment track records, grid-tie compliance, monitoring platforms, portable backup needs, site pest risk, and total cost transparency.

Who This Checklist Is For

I'm not an electrician. I don't size conduits or calculate voltage drop. I'm the office administrator who signs the purchase order after the electrician tells me what to buy—and then has to explain to finance why the total came in 18% over the quote.

That last part is why I built this checklist.

We're a 220-person company across two buildings. I manage facilities and equipment ordering—roughly $180K annually across 11 vendors. (I was going to say we process about 180 POs a year. Closer to 200, I'd have to check the system.) I report to both operations and finance, which means I get it from both sides when a project runs over.

Solar and storage entered the picture in late 2024 because our backup generator is 14 years old and Building B's roof finally got re-rated for panels—that was a two-year process on its own. I had six weeks between "let's look into solar" and a signed contract. Not enough time to become an expert. Enough time to ask the questions that matter.

Here are the seven steps I use now. (Should mention: I'm writing from the buyer's side, not the installer's. If you're specifying the system yourself, your list will look different.)

The 7-Step Checklist

Step 1: Size the fuse for starting current, not running load

This is the step I got wrong first, and it's the one most buyers skip entirely.

LiFePO4 batteries have very low internal resistance. When you connect an inverter, the inrush current—the brief spike when capacitors charge and the inverter starts—can hit three to five times the continuous rating. If the DC fuse is sized only to the continuous load, it will nuisance-trip or blow on startup. I've seen this happen twice now.

One vendor quoted a 150A fuse for a 5kW inverter on a 48V system. Continuous current works out to roughly 104A. Looks fine on paper. But the inverter's startup surge is closer to 300A for a few milliseconds. That fuse is going to blow, probably within the first week.

Ask the vendor: "What's the inverter's surge rating, and how did you size the DC fuse against it?" If they can't answer in one sentence, keep looking. (Note to self: get the surge spec in writing next time, not just the continuous rating on the datasheet.)

Step 2: Check the shipment numbers, not the brochure

SMA's 2023 annual report (published March 2024) reported inverter shipments of roughly 20 GW. That's a real number from a real filing—not a marketing claim. When I'm comparing vendors, I want to know they've shipped at scale, because scale usually means spare parts exist and support lines are staffed.

But here's the nuance that took me a while to appreciate: shipment volume doesn't tell you about service quality in your region. A vendor that shipped 20 GW globally can still have a two-week response time in your metro area.

So I ask two questions. First: "What were your shipments last year?" Verifies they're a real player. Second: "How many service technicians do you have within 100 miles of our zip code?" Verifies they can actually help me.

The first answer tells me if they'll exist in five years. The second tells me if I'll survive the next outage. It's tempting to think one number tells the whole story. It doesn't.

Step 3: Confirm grid-tie compliance and who files the paperwork

Grid-tie inverters have to meet your utility's interconnection requirements. That's not optional, and it's not the same everywhere.

For our project, the utility required UL 1741 SA certification—the newer standard with grid-support functions. The first vendor quoted a model certified under the older UL 1741 standard. Fine for some jurisdictions, not ours. We would have found out at inspection, after the panels were already on the roof.

Ask for the specific certification documents, not the marketing sheet. And ask who files the interconnection application: the vendor, the installer, or you? I've seen all three arrangements. The answer changes your project timeline by weeks, sometimes months.

Step 4: Test the monitoring platform with your own eyes

Every vendor says their monitoring is "intuitive." Every monitoring platform I've used is somewhere between "fine" and "why does this require a browser plugin from 2011."

Before signing, ask for a demo account—not a sales demo, an actual login. Spend 15 minutes in it. Can you see per-panel production? Can you set alerts for underperformance? Can you export a monthly report without calling support?

SMA's platform (Sunny Portal) has been around long enough that most installers know it. That's actually a point in its favor—your maintenance contractor probably already has experience with it. But "well-known" isn't the same as "works for you." Log in and check.

Step 5: Decide if portable backup is a real need or a nice-to-have

We looked at adding a couple of portable power stations for the mailroom and the server closet during short outages. The two names that kept coming up were Jackery and EcoFlow.

I'm not going to tell you one is better. I don't have enough runtime data, and the models change every eight months. What I will tell you: these are consumer-grade units. They're great for a trade show booth or a temporary office. They are not a substitute for a properly sized UPS or a generator.

The question I ask now: "How many minutes of runtime do we need, and what's the actual load?" For our server closet, the answer was 12 minutes at 400W—a small UPS handled it for a third of the price. For the mailroom, we didn't need backup at all.

Put another way: don't let a product category create a need that wasn't there.

Step 6: Walk the installation site for pest and moisture risk

This is the step nobody puts on the checklist, and it's the one that cost us.

Our panels went on a flat roof with a parapet. Six months later, we found termite tubes along the conduit runs. The warm, dark space behind the panels was apparently ideal. We had to call a termite monitoring service and re-route two cable runs. Not catastrophic, but $1,900 we hadn't budgeted.

Now I walk the site before installation and ask: Where does water pool? Where does the conduit penetrate the building envelope? Is there existing pest activity within 20 feet? If the answer to any of those is "I'm not sure," get a monitoring service quote before the panels go up, not after.

Looking back, I should have asked the installer to include a site survey in the original quote. At the time, it seemed like an unnecessary line item. It wasn't.

Step 7: Put every fee on one page before you compare totals

This is the transparency point, and I'll be blunt: the cheapest quote is usually not the cheapest project.

Our three quotes ranged from $41K to $58K for what looked like the same scope. The $41K quote excluded commissioning ($2,800), freight ($1,200), and the first year of monitoring ($600). Add those and it's $45,600. The $58K quote included everything plus a five-year monitoring subscription. The "expensive" quote was actually the better deal by year three.

I've learned to ask "what's NOT included" before "what's the price." The vendor who lists all fees upfront—even when the total looks higher—usually costs less in the end. And if a vendor won't put the fee schedule in writing before you sign, that's your answer.

Three Mistakes I've Made (So You Don't Have To)

  1. Comparing quotes before normalizing scope. "Same system" means different things to different vendors. Build a scope sheet first, then make every quote fill it in.
  2. Skipping the fuse and surge calculation. It's the cheapest thing to get right and the most annoying thing to get wrong. Ask for the surge spec in writing.
  3. Assuming monitoring is included. Sometimes it is. Sometimes it's a subscription. Sometimes it's a subscription the installer forgot to mention. Get it in the contract.

That's the list. It's not perfect—I'm still learning—but it's kept me from signing two bad contracts in the last 18 months. For me, that's an improvement.